From rapid tooling for 100-part pilot runs to hardened steel production molds rated for 1M+ shots, SkillsProto runs a full plastic injection molding service. We offer DFM and mold flow analysis before cutting steel, so T1 samples arrive right the first time.
Rapid aluminum tooling — T1 samples in 7–10 days
Production steel molds (P20, H13, S136), 100k–1M+ shots
Insert molding, overmolding and two-shot molding
Mold flow analysis (Moldex3D) and full DFM reports
30–500 ton machines, 1–32 cavities
Bridge tooling between prototyping and mass production
| Material group | Common grades |
|---|---|
| Commodity | ABS, PP, PE, PS, PVC, TPE, TPU |
| Engineering | PC, PA6/PA66, POM, PMMA, PBT, PET, PC/ABS |
| High-performance | PEEK, PEI (Ultem), PPS, PPSU, PSU |
| Optical / medical grades | PMMA optical, USP Class VI, ISO 10993 |
| Specification | Details |
|---|---|
| Mold lead time | Aluminum 7–10 days, steel 15–25 days |
| Tolerance | ISO 2768-c / ±0.05 mm typical |
| Press tonnage | 30–500 tons |
| MOQ | from 100 pieces |
| Mold life | Aluminum ~5k shots; steel 100k–1M+ |
| Finishes | SPI A1–D3, texture, pad/silk printing |



Send STEP/IGES/DXF — NDA on request.
Engineers review manufacturability and price.
In-process QC with photos at key stages.
FAI report, material certs, DDP shipping.
Rapid aluminum molds for simple parts typically start around USD 1,500; multi-cavity hardened steel production molds range from USD 4,000 to 20,000+. Every quote includes a DFM report so you know exactly what you're paying for.
Rapid tooling uses aluminum or soft steel molds to bridge the gap between prototyping and mass production — perfect for 100–5,000 piece pilot runs at a fraction of production tooling cost.
Yes. We regularly mold over brass/stainless inserts, PCBs and cables, and two-shot TPE-over-PC/ABS parts.
Yes — resin lot certificates, UL94 flammability data and color-matching reports on request.
Send your files today — DFM-checked quotation within 24 hours.